ABNT ISO TR 10013 PDF

ISO/TR (en), Guidelines for quality management system. . Título: Esta Versão Corrigida da ABNT ISO/TR de , incorpora a Errata . Direct link NBR ABNT iso tr free pdf ISO TR – Diretrizes para a documentacao de sistema de gestao da qualidade(1).pdf. ISO/TR. (E). PDF disclaimer This PDF file may contain embedded typefaces. In accordance ABNT ISO/TR um guia para a.

Author: Tera Gorg
Country: Trinidad & Tobago
Language: English (Spanish)
Genre: History
Published (Last): 1 April 2018
Pages: 320
PDF File Size: 5.25 Mb
ePub File Size: 7.79 Mb
ISBN: 501-8-61486-304-1
Downloads: 25914
Price: Free* [*Free Regsitration Required]
Uploader: Tujind

ISO TR – PDF Free Download

Marco Vinicio Tapia Aulema Category: Quality and Productivity Improvements – 4. Tier 2 and below. The goal of ES testing is to confirm that the design 10031 has been met. Reference is made to Element 4.

For characteristics not controlled with SPC and not enumerated on a Control Plan, one or more of the following methods should be selected: Therefore, abbt suppliers will be viewing this document for the first time.

The registration process shall encompass all QS requirements. Plant layouts should minimize material travel and handling, facilitate synchronous material flow, and maximize value-added use of floor space.

Pertinent quality records from the subcontractor shall be an element of these data. Amendment to a Contract4. The supplier should provide means uso employee empowerment in meeting business goals.

  LA BALLENA VARADA PDF

Norma Abnt ISO – PDF Free Download

While other companies may adopt this document, Ido, Ford, and General Motors retain full 1001 over the content except for ISO Only registration certificates citing conformance to QS will be acceptable to the companies using this document. Inspection method, frequency, etc. Government, Safety and Environmental Regulations – 4. The management personnel responsible for the area shall take timely corrective action on the deficiencies found during the audit. The plans shall be updated, as the design evolves.

The laboratory scope shall include the calibration of such equipment. Presence of a Diamond does not affect the significance to a Shield s on the same document.

Lot Traceability Lot Traceability shall be maintained. All production tooling shall be in place and running at full production izo and speeds, utilizing all regular production direct and indirect personnel and support systems.

Engineering Change Validation – 4. The processes become non-capable.

Interpretations and supplemental quality system requirements have been harmonized and are printed in normal type. Is the scope of the QS registration appropriate for the product being supplied and does it include the appropriate ISO standard or ?

  GLIDECAM 2000 MANUAL PDF

ISO TR 21074-2016

Define delisting criteria, and steps for delisting QS registrants. The Second Edition may continue to be used until January 1, sbnt which time it becomes obsolete, unless otherwise notified by the customer. These trends should be compared to those of competitors, or appropriate benchmarks, and reviewed by senior management.

The supplier shall use a multi-disciplinary approach to develop Control Plans.

Norma Abnt ISO 8528-1

The worldwide demand for QS has created the need for this second edition, which becomes effective immediately. II 50 Required to gr to Condition I if any sample group has any nonconforming units. Design input requirements relating to the product, including applicable statutory and regulatory requirements, shall be identified, documented and their selection reviewed by the supplier for adequacy.

Management Review – 4. All information requested 1013 be provided in the submission. The supplier is not required to return signed Purchase Order Acknowledgments unless otherwise specified by the customer.